• October 4, 2024
  • ICAD III, Abu Dhabi, UAE

All Posts

Offshore Pedestal Crane Load Testing by Water Filled Weight Bags?

Our Lifting Inspection team recently completed a 200-ton crane load testing assignment for one of the major shipping company in.

Continue Reading

How to get Brazer Certification and Brazing Procedure Qualification?

This article covers the to find the solution of Brazer Certification, Brazing procedure Qualification, Brazing Procedure Qualification Records, Third Party Brazing.

Continue Reading

How to qualify welder, welding procedure (WPS) and PQR?

Here we are discussing about how to prepare a welding specification .Welding Procedure(WPS) is a written document that gives instructions.

Continue Reading

What is meant by Topographical Survey or Topography Services?

What is Topography? Topography or topographical survey is an accurate examination that maps the physical attributes and features of a.

Continue Reading

How to do Fuel oil Storage tank Calibration and Tank strapping?

Above Ground Storage tank Calibration: Above Ground Storage tank calibration is performing as per API Manual of Petroleum measurement Standards.

Continue Reading

How to perform Proof load testing of offshore Pedestal crane?

Pedestal Crane Load Testing Procedure: Proof load testing and certification of Pedestal Crane Load shall be performed by water weights.

Continue Reading

What is 3D Laser Scanning and LiDAR Scanning Survey?

What is 3D Laser Scanning? The process of examining an object in the real world and gathering all the necessary.

Continue Reading

Procedure for Wire rope socketing and Destructive Testing ?

What is Wire rope socketing? A termination fitting is attached to the end of a wire rope cable by a.

Continue Reading
Open chat
1
Hello
Can we help you?