How to do a proof load testing of 100 ton Pedestal crane.?
Stages of Inspection: Determine if the hook is single or double before loading the crane with a water bag and.
EIWAA is an Inspection, Testing, Volume Calibration, Design and Survey Service provider established in 2014.
Stages of Inspection: Determine if the hook is single or double before loading the crane with a water bag and.